The Cooper's Hawk in Middleton, WI was one of the first projects that I worked on from schematic design through construction administration at Aria Group. Cooper's Hawk projects are generally 60% prototypical, and 40% new design. This project was a fantastic introduction to not only the client, but the hospitality industry as a whole. For this project, I was mainly involved in the design production for the interiors, the construction documents, and the construction administration. I worked closely with a senior designer throughout the project, and worked with architectural technicians throughout the construction documentation.

SIMILAR WORKS

Back to Top